South-East Asia Japan Cable System (SJC)

SJC’s length has since been lengthened to 8,900 kilometers, extendable to up to 10,700 kilometers, linking eight countries (Brunei, China/Hong Kong, Taiwan, Singapore, Indonesia, Japan, The Philippines, and the United States.) and territories while supporting an initial design capacity of over 15 terabytes per second.

Once completed within two years, the SJC will be the highest-capacity submarine cable system in the world.

Telin Capabilty

Recent Articles